Building a New House Construction Stages

Slab Foundation

Stage 1, Early on.  The right show empty land, and the left shows the wood frame being constructed and some loose pipes

The Pipes can be seen in the dug out trench


Around the time of the Cement Pour. Some Foundations will not have the Wire mesh on top of the plastic see video.


End Stage before the Cement is Poured on the foundation

 

 

Pre Pour Slab Foundation

 

Slab Foundation before the cement is poured

Completed Cement Slab Foundation (right shows first floor Cement Block beginning)

 

First Floor Cement Block going on slab

First Floor Cement Block is u

Ready for Second Floor Block

Getting Ready for Second Floor Block

Second Floor Block on Block and Ready for the Roof

Second Floor Block Up

Second floor Wood frame (zip systems) on Block, a Townhouse

Second Floor Wood Frame on Townhouse with Zip Board

Second Floor Wood Frame on Block with OSB Board (housewrap should be on top)

Wood Frame on Block OSB Board

Second Floor House Wood Frame on Block- House Wrap added

House Wrap Over OSB Board. Wood Frame over Cement Block

Windows and Roof Going On, block on block house

Windows and Roof are being added

House Interior is framed, wired and plumbed. HVAC Ducts and Windows installed.  Floorboard in.  Drywall delivered.


Drywall Delivery arrived. Pre drywall inspection time

Pre Drywall(Sheetrock) Inspection

 

There is no other inspections after this framing one until the house is completed.