Slab Foundation
Stage 1, Early on. The right show empty land, and the left shows the wood frame being constructed and some loose pipes
The Pipes can be seen in the dug out trench
Around the time of the Cement Pour. Some Foundations will not have the Wire mesh on top of the plastic see video.
Completed Cement Slab Foundation (right shows first floor Cement Block beginning)
First Floor Cement Block going on slab
Ready for Second Floor Block
Second Floor Block on Block and Ready for the Roof
Second floor Wood frame (zip systems) on Block, a Townhouse
Second Floor Wood Frame on Block with OSB Board (housewrap should be on top)
Second Floor House Wood Frame on Block- House Wrap added
Windows and Roof Going On, block on block house
House Interior is framed, wired and plumbed. HVAC Ducts and Windows installed. Floorboard in. Drywall delivered.
Pre Drywall(Sheetrock) Inspection